Saltar al contenido
iScooter · iX7 Pro · chassis

iScooter iX7 Pro — Assembly and folding/unfolding procedure

Medio

Riesgos

  • LOW

Pasos

  1. Official assembly: connect handlebar to stem, pre-tighten the four bolts then tighten to equal torque; align rear-fender mounting holes and tighten all bolts. Folding: turn off scooter, open folding latch, flip safety lever forward, fold down stem, engage fender latch onto fender hook (stem doubles as carrying handle). Unfolding: adjust fender latch to disengage from fender hook, lift stem to riding position until first click, close folding latch until second click.

Fuente oficial: https://cdn.shopify.com/s/files/1/0605/4549/9286/files/iX7Pro_Manual_UK_V2_241204.pdf (tier A). Traducción/paráfrasis fiel del manual oficial; no se ha añadido ningún procedimiento no documentado.

Volver al Centro Técnico